This is the island, we have not installed it yet because we need the plumber there. Hopefully he will be able to come out this week so we can get it installed as well.
We had a cabinet installed in the bathroom as well. There was a lot of space behind the door so we decided to utilize it.
Mark spent the rest of the day closing in the garage and floating out concrete.
Mom was over at the house and we both worked on the girls' bathroom cabinets. I think they are turning out nice.
I also worked on sealing the trim and painting the cabinet shelves for the upper cabinets in the pantry.
No comments:
Post a Comment